详细说明整理中,需要完整规格请联系我们。
Yes. The same Gerber and stack-up review applies; we fabricate the board only on Dongguan-managed lines, with no component sourcing and no SMT.
Gerber files plus a one-line note on quantity, layer count, thickness and surface finish. BOM and pick-and-place files are only needed if you also want assembly.
2-8 layer prototypes typically ship in about 48 hours after the files are confirmed; small batches run from 5 pcs to 5,000 pcs on the same QC checklist.
AOI on the bare board, plus FAI and X-ray where assembly is involved. Every order is inspected against the same ZiLian checklist.